检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:庄有军 周天俊 王晓晓 陈秀荣 于泽亚 徐燕 ZHUANG Youjun, ZHOU Tianjun, WANG Xiaoxiao, CHEN Xiurong, YU Zeya, XU Yan(State Environmentcd Protection Key Laboratory of Environmental Risk Assessment and Control on Chemical Process, School of Resources and Environmental Engineering, East China University of Science and Technology, shanghai 200237, Chin)
机构地区:[1]华东理工大学资源与环境工程学院国家环境保护化工过程环境风险评价与控制重点实验室,上海200237
出 处:《水处理技术》2018年第4期41-45,共5页Technology of Water Treatment
基 金:国家水专项课题(2014ZX07202-011)
摘 要:针对传统城市污水碳氮比低、生物二级处理脱氮同时TP去除效果差、二级出水TP含量较高且不稳定的问题,将钢渣细砂混合应用于深度除磷阶段,以提高TP的处理效率并降低混凝剂聚合硫酸铁(PFS)投加量。结果表明,进水TP的质量浓度为1.5~2.0 mg/L,钢渣和细砂质量比4:1混合投加、PFS的投加量为6 mg/L时,出水TP的质量浓度仍达到0.434 mg/L(低于GB 18918-2002一级A标准),TP去除量为1.8 mg/L,去除率达80.6%,PFS投加量节省20%~40%,TP去除率提高17.57个百分点。通过真空电子扫描电镜观察发现,钢渣和细砂混合投加与PFS联用可改变絮体结构,使絮体小而密实;当沉降6 min时,絮体沉降体积提高65%左右,可有效缩短絮体沉降时间,提高沉淀效率。Considering the low C/N ratio of traditional mtmicipal wastewater, the poor removal effect of TP during denitrification in the secondary biological treatxnent, and the high and unstable TP content in the secondary effluent, steel slag and microsand were mixed and applied in the stage of deep dephosphori- zation to improve the treatment efficiency and reduce the dosage of coagulants. The results showed that the effluent mass concentration of TP could still reach 0.434 mg/L ,which was lower than the first A standard of GB 18918-2002, the removal amount was 1.8 mg/L and the removal rate reached 80.6% when the influent mass concentration of TP was 1.5-2.0 mg/L, the dosage of steel slag and microsand mass ratio was 4:1 and the dosage of PFS was 6 mg/L. The dosage of the PFS could reduce 20%-40% and the treatment efficiency could be increased by 17.57 percentage points. The combination of steel slag and microsand mixed with PFS could change the flocs structure, which became small and dense through the vacuum scanning electron microscopy observation. The volume offloc settlement increases by 65% when the settlement time was 6 min, which could effectively shorten the settling time of flocs and improve the sedimentation efficiency.
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229