检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙哲星 SUNZhe xing1,2(1. School of Mechanical Electronic and Information Engineering, China University of Mining and Technol ogy (Bei ji ng)’ Bei jing 100083, Chi na;2. Bei j ing Data Center, Chi na Construction Bank, Bei jing 100068, China)
机构地区:[1]中国矿业大学(北京)机电与信息工程学院,北京100083 [2]中国建设银行股份有限公司北京数据中心,北京100068
出 处:《工矿自动化》2018年第4期30-33,共4页Journal Of Mine Automation
基 金:国家重点研发计划资助项目(2016YFC0801800);国家自然科学基金重点资助项目(51134024);国家高技术研究发展计划(863计划)资助项目(2012AA0622031)
摘 要:研究了4种基于时间测距的矿井人员定位方法:TOA、TWR、SDS-TWR和TDOA定位方法,它们受巷道环境等影响小,适用于煤矿井下人员精确定位。TOA定位方法要求发射设备和接收设备的时间必须严格准确同步,对发射设备和接收设备时钟精度要求非常高,并且要同步校准,定位卡和定位分站成本高。TWR定位方法不要求信号发射设备与接收设备时钟严格同步,降低了系统复杂度和成本,但定位精度受定位分站和定位卡的时钟误差影响,定位卡和定位分站成本较高。SDS-TWR定位方法不要求信号发射设备与接收设备时钟严格同步,降低了分站和定位卡的时钟误差对定位精度的影响,但定位精度仍受定位分站和定位卡的时钟误差影响,定位卡和定位分站成本较高。TDOA定位方法要求定位分站之间的时间必须严格准确同步,对定位分站时钟精度要求高,并且要同步校准,定位卡成本低,定位分站成本高。Four kinds of mine personnel positioning methods based on time range were researched,namely TOA,TWR,SDS-TWR and TDOA positioning methods,they are less influenced by roadway environment and suitable for mine personnel precise positioning.TOA positioning method requires time of transmitting device and receiving device must be strictly and accurately synchronized,clock accuracy requirement of transmitting device and receiving device is very high with synchronous calibration,so its positioning card and substation cost high.TWR positioning method does not need to strictly synchronize in clock of signal transmitting device and receiving device,so complexity and cost of its positioning system is reduced,but its positioning precision is affected by clock error of positioning card and substations,positioning card and substation cost high.SDS-TWR positioning method does not need to strictly synchronize in clock of signal transmitting device and receiving device,so influence of clock error of its positioning substation and card on positioning precision is reduced,but its positioning precision is affected by clock error of positioning card and substations,positioning card and substation cost high.TDOA positioning method requires time between positioning substations must be strictly and accurately synchronized,and clock accuracy requirement of positioning substations is very high with synchronous calibration,positioning card cost lower and positioning substation cost higher.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38