检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冉艳华 RAN Yanhua(CNOOC Petrochemical Engineering Co., Ltd.,Jinan 250101, China)
机构地区:[1]中海油石化工程有限公司,山东济南250101
出 处:《四川建材》2018年第4期56-57,59,共3页Sichuan Building Materials
摘 要:在地下水位较高的地区,设计埋地式水池时,抗浮稳定验算是主要考虑的因素之一。合理选择抗浮设计方案,直接影响到结构设计的合理性、工程造价以及后期运行。本文分析比较了自重抗浮、增加配重抗浮、底板下设平衡层抗浮、设抗拔桩抗浮、设抗拔锚杆抗浮等常用方法的使用条件和经济性,并结合实际工程案例讨论,抗浮设计时,应根据工程的实际情况,进行各方案的分析比较,选择更为合理、更为经济的抗浮方案。Anti - floating stability calculation is one of the key factors during the designing and constructing of underground water pool, especially in a relative high ground water area. The anti - floating scheme would produce effects on the rationality,project cost and real operation. This text analyses the service conditions and economic of the various anti - floating design projects. To choose a more reasonable and economical anti - floating program in design, comparative analysis of different design plans according to different geologic conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170