检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王立坤 Wang Likun(Communication University of China, Beijing 100024, Chin)
机构地区:[1]中国传媒大学,北京100024
出 处:《智能建筑电气技术》2018年第1期77-79,共3页Electrical Technology of Intelligent Buildings
摘 要:结合某实际项目,分析了新版GB 50116-2013《火灾自动报警系统设计规范》自实施以来对项目施工管理带来的影响。首先对比分析了新、旧规范的不同之处,其次对某项目在新、旧规范实施过渡阶段遇到的施工管理问题进行讨论,并从施工管理角度对于新规范的实施提出几点建议。Combined with a protect, the impact of new code for design of automatic fire alarm system on project construction management is analyzing. First, the differences of the new and old norms are compared and analyzed. Secondly, the construction management problems encountered in the transition stage the implementation of the old and new norms are discussed, and some suggestions for the implementation of the new norm from the perspective of construction management are put forward.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49