检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚艳玲[1] 张新周[2] 吕军[1] 李祥 Yanling Yao;Xinzhou Zhang;Jun Lv;Xiang Li(Songliao River Water Environmental Science Research Institute, Songliao River Basin Water Resources Protection Bureau, Changchun Jilin;Key Lab of Port, Waterway and Sedimentation Engineering of the Ministry of Transport, Nanjing Hydraulic Research Institute, Nanjing Jiangsu;Department of Port and Coastal Engineering, Hohai University, Nanjing Jiangsu)
机构地区:[1]松辽流域水资源保护局松辽水环境科学研究所,吉林长春 [2]南京水利科学研究院港口航道泥沙工程交通行业重点实验室,江苏南京 [3]河海大学港口海岸与近海工程学院,江苏南京
出 处:《水资源研究》2018年第2期126-134,共9页Journal of Water Resources Research
基 金:国家自然科学基金(51409163,51479122);国家重点研发计划(2017YFC0405400)资助
摘 要:调水工程是解决地区水资源不足或时空分布不均衡问题的必要工程措施,不同水库间通过管道和河流调水会对调蓄水库水温产生影响。采用二维水流水温数学模型模拟了吉林省引松供水工程调水对调节水库石头口门水库水温的影响。计算结果表明,调水对调蓄水库水温影响的范围、时间主要和调水量、调水温差、水库水深、入水口位置等有密切关系。引松供水工程调水量和调蓄水库的水量相比很小,调水对水库水温分布的影响有限。调水入水口位于库尾,受影响的范围基本局限于水库库尾局部范围内,水温影响在1个月内即达到平衡,对整个库区和坝前影响很小。调水工程入水口远离坝址可以减小调水对调蓄水库及下游河流的影响程度。Water transfer project is the necessary engineering measure to solve the problem of insufficient water resources or the imbalanced spatial and temporal distribution problems. Water diversion between different reservoirs through the pipeline and river will affect the reservoir water temperature. The two-dimensional hydrodynamic-thermal mathematical model is used to simulate the influence of the Jilin Province Water Diversion Project on the water temperature of Shitoukoumen Reservoir. The results show that the effect of the project to the range and time of the reservoir water temperature regulation is closely related to the amount of water transferred, the water temperature difference, the water depth of the reservoir and the position of the water inlet. The water amount of Jilin Province Water Diversion Project is very small compared with that of the storage reservoirs, and the influence of water diversion on the water temperature distribution in the reservoir is limited. The water diversion inlet is located at the end of the reservoir. The affected area is basically limited to the local area of the reservoir tail. The impact of water temperature reaches equilibrium within one month, with little impact on the whole reservoir area and the dam. Water diversion project away from the dam site can reduce the impact of the reservoir and downstream rivers.
分 类 号:TV697.21[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145