检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫阿利
机构地区:[1]中国铁路设计集团有限公司,天津市300142
出 处:《城市道桥与防洪》2018年第4期62-64,89,共4页Urban Roads Bridges & Flood Control
摘 要:按照目前高速铁路的相关规定,新建工程与建成后的高速铁路交叉时,原则上应采取新建工程下穿既有高速铁路的建设方案。以下穿净高受限的既有高速铁路桥梁为切入点,采取能够有效降低桥梁高度的中小跨度连续板桥下穿既有高速铁路桥梁。从结构设计、安全评估和施工、运营期间的变形监测等方面深入分析了新建桥梁对既有高速铁路桥梁的影响,研究成果可作为其他同类工程的设计参考。According to the relative stipulations of high-speed railway now,the construction scheme for the newly built project to intersect with the built high-speed railway should be the newly built project underneath to pass the existing high-speed railway in principle.Taking the limited net height of the existing high-speed railway bridge as an entry point,the small-span and middle-span continuous slab bridges able to efficiently reduce the bridge height are used underneath to pass the existing high-speed railway bridges.The article further analyzes the influence of the newly built bridges on the existing high-speed railway bridges from the aspects of structural design,safety evaluation,and deformation monitoring in construction and operation periods.The study result can be referred for the design of the other similar projects.
分 类 号:U442.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.124