检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:GUO Rong QI Liang-bo GE Qian-qian WENG Yong-yuan 郭蓉;漆梁波;葛倩倩;翁永元(Shanghai Central Meteorological Observatory, Shanghai 200030 China;Shanghai Typhoon Institute of CMA, Shanghai 200030 China;Zhejiang University of Finance & Economics, Hangzhou 300016 China;Shanghai Meteorological Bureau, Shanghai 200030 China)
机构地区:[1]Shanghai Central Meteorological Observatory,Shanghai 200030 China [2]Shanghai Typhoon Institute of CMA,Shanghai 200030 China [3]Zhejiang University of Finance&Economics,Hangzhou 300016 China [4]Shanghai Meteorological Bureau,Shanghai 200030 China
出 处:《Journal of Tropical Meteorology》2018年第1期42-48,共7页热带气象学报(英文版)
基 金:National Natural Science Foundation of China(41475060,41275067,41405060)
摘 要:Using real-time correction technology for typhoons, this paper discusses real-time correction for forecasting the track of four typhoons during 2009 and 2010 in Japan, Beijing, Guangzhou, and Shanghai. It was determined that the short-time forecast effect was better than the original objective mode. By selecting four types of integration schemes after multiple mode path integration for those four objective modes, the forecast effect of the multi-mode path integration is better, on average, than any single model. Moreover, multi-mode ensemble forecasting has obvious advantages during the initial 36 h.Using real-time correction technology for typhoons, this paper discusses real-time correction for forecasting the track of four typhoons during 2009 and 2010 in Japan, Beijing, Guangzhou, and Shanghai. It was determined that the short-time forecast effect was better than the original objective mode. By selecting four types of integration schemes after multiple mode path integration for those four objective modes, the forecast effect of the multi-mode path integration is better, on average, than any single model. Moreover, multi-mode ensemble forecasting has obvious advantages during the initial 36 h.
关 键 词:typhoon path real-time correction ensemble forecast track errors
分 类 号:P456.7[天文地球—大气科学及气象学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.213.242