检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:熊学玉[1,2] 张仪放 Xiong Xueyu;Zhang Yifang(Institute of Prestressed Structures, Tongji University, Shanghai 200092, China;Key Laboratory of Advanced Civil Engineering Materials(Tongji University), Ministry of Education, Shanghai 200092, China)
机构地区:[1]同济大学预应力研究所,上海200092 [2]同济大学先进土木工程材料教育部重点实验室,上海200092
出 处:《建筑结构》2018年第8期103-107,共5页Building Structure
摘 要:简要介绍了箱梁桥腹板斜裂缝问题和近年来快速发展的缓粘结预应力技术,并从缓粘结预应力的技术特点出发论述了将缓粘结低回缩预应力短索应用于箱梁桥腹板的优势。从有效预应力计算的角度,比较了现有精轧螺纹钢体系和基于测控一体的缓粘结低回缩预应力短索体系的差别,给出了基于测控一体的缓粘结低回缩预应力短索体系的张拉方法。The problem of oblique cracks in webs of box girder bridge and the development of retard-bonded prestressed technique in recent years were briefly introduced. The advantages of applying the retard-bonded low-retraction prestressed short tendons to the webs of box girder bridge were discussed from the technical characteristics. From the point of view of effective prestressing calculation,the difference between the finished deformed steel bar system and the retard-bonded low-retraction prestressed short tendons system based on integrated measurement and control technology were compared.The tensioning method of the retard-bonded low-retraction prestressed short tendon system based on integrated measurement and control technology was provided.
关 键 词:腹板斜裂缝 缓粘结低回缩预应力短索 测控一体
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249