检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黎展眉
机构地区:[1]贵州省水利厅,贵州贵阳550002
出 处:《水利水电科技进展》2002年第4期1-3,共3页Advances in Science and Technology of Water Resources
摘 要:阐述用应力指数法实现拱坝主应力满应力设计的思路和方法要点 ,介绍等截面圆弧拱坝及变截面抛物线拱坝两种算例成果 .算例表明 ,应力指数 βi 相对固定的应力指数法是适应拱坝主应力满应力优化的有效、可行的方法 ,只需在原有的拱坝应力分析程序的基础上稍加扩充即可实现 .对于初始方案基本合理的拱坝 ,一般迭代 5~8次 ,优化后坝体方量可节省 1 2 %~ 2 0 % .The train of thought and key points of the stress index method are described for the principal stress and ultimate stress design of arch dams. Two arch dams are calculated as examples: one is a prismatic circular arch dam, and the other is a non prismatic parabolic arch dam. The calculated result shows that the stress index method, with a constant value of β i , is a feasible method for optimization of the principal stress and ultimate stress of arch dams, and can be realized only by slight expansion of the original program used for analysis of arch dam stresses. For those arch dams with reasonable original design schemes, the optimization of dam stresses can be realized by 5~8 times of iteration. The optimization can help save 12%~20% earthwork in dam construction.
分 类 号:TV64[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222