“三高”面板堆石坝面板混凝土的施工与质量控制  

Face Slab Concrete Construction and Quality Control for High Concrete Face Rockfill Dam at High Altitude in High Cold Area

在线阅读下载全文

作  者:任勤[1] 王晶 

机构地区:[1]四川华电木里河水电开发有限公司,四川西昌615000 [2]中国华电集团有限公司四川分公司,四川成都610095

出  处:《四川水力发电》2018年第2期75-77,共3页Sichuan Hydropower

摘  要:卡基娃水电站面板堆石坝最大坝高171 m,是我国在海拔2 000 m以上高原地区建设的最高面板堆石坝,大坝二期面板浇筑工程量大,工期紧,单块面板最大连续浇筑长度长,且因面板混凝土受工期影响需安排在雨季施工。结合卡基娃水电站大坝二期面板混凝土施工,介绍了高海拔、高寒、高面板堆石坝面板混凝土施工工艺以及质量控制要点,可供同类工程参考。Kajiwa Hydropower Station is the highest concrete face rockfill dam at the altitude of above 2 000 m,with the maximum dam height of 171 m. The second stage slab concrete construction is characterized with large amount of work,tight construction schedule and long maximum continuous pouring length of single block,therefore,the construction of this work should be arranged in the rainy season. In this paper,combined with the slab construction in the second period in Kajiwa project,face slab concrete construction technology and quality control points for high concrete face rockfill dam at high altitude in high cold area are presented to provide references to similar projects.

关 键 词:面板施工 面板堆石坝 质量控制 卡基娃水电站 

分 类 号:TV7[水利工程—水利水电工程] TV52

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象