检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈丽[1] 师立涛[1] Chen Li;Shi Litao(Hebei Electric Power Design & Research Institute, Shijiazhuang 050031, China)
机构地区:[1]河北省电力勘测设计研究院,石家庄050031
出 处:《河北电力技术》2018年第1期5-7,共3页Hebei Electric Power
摘 要:利用PSD-BPA软件对特高压投产前后河北省南部电网500 kV电压进行计算分析,计算结果表明:特高压投产后河北省南部电网500 kV电压水平普遍提高,同时造成部分500 kV站点低压侧电压过高,使得电容器难以投入,限制了电网电压调整能力,分析结果可为以后500 kV变压器额定电压的选取提供参考。PSD-BPA software is used to calculate and analyze the 500 kV voltage of Hebei southern power grid before and after UHV operation. The results show that the voltage level of 500 kV in Hebei southern power grid is generally increased after the UHV is put into operation,and the voltage on the low voltage side of some 500 kV stations is too high,which makes the capacitor difficult to be put into operation,which limits the voltage regulation ability of the grid. The analysis results can provide reference for the selection of the rated voltage of 500 kV transformer.
关 键 词:特高压 500 KV电网 电压水平 无功协调控制
分 类 号:TM712[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31