电动矿用运输车恒功率充放电策略的实现  被引量:1

Realization of Constant Power Charging and Discharging Strategy for Electric Mine Transport Vehicle

在线阅读下载全文

作  者:陈尔奎[1] 尹晓钢 魏哲[1] 石倩倩[1] CHEN Er-kui;YIN Xiao-gang;WEI Zhe;SHI Qian-qian(Shandong University of Science and Techology, Qingdao 266590, Chin)

机构地区:[1]山东科技大学,山东青岛266590

出  处:《煤炭技术》2018年第5期219-221,共3页Coal Technology

基  金:山东省自然科学基金(ZR2011FM008)

摘  要:为了实现电动矿用运输车的恒功率充放电过程,简要介绍了电动矿用运输车充放电系统的基本结构,借助PSCAD软件实现双向DC/DC变换器和三相电压型PWM变换器的控制方案,采用恒功率充放电策略进行仿真试验,从而完成了电网与电动矿用运输车之间能量的双向流动过程,结果显示可实现以单位功率因数运行,网侧谐波含量很低,大幅度提高了电能质量。In order to realize the constant power charge discharge process of electric mine transport vehicle, briefly introduces the basic structure of mine electric vehicle charge and discharge system,the control scheme of bi-directional DC/DC converter and three-phase voltage source PWM converter is realized with the help of PSCAD software,the simulation experiment is carried out using constant power charge and discharge strategy, and the two-way flow of energy between the grid and the electric vehicle is completed,operating at unity power factor, and the harmonic content is very low, which greatly improves the power quality.

关 键 词:电动矿用运输车 PSCAD 三相电压型PWM变流器 双向DC/DC变换器 

分 类 号:TM762[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象