超临界直流机组RB试验若干问题探讨  被引量:2

Discussion on Some Problems for RB Test of Supercritical Unit

在线阅读下载全文

作  者:张彪 周慧 岳良 Zhang Biao;Zhou Hui;Yue Liang(Hubei Provincial Electric Power Test Research Institute, Wuhan Hubei 430077,China;WenHua College, Wuhan Hubei 430074,China)

机构地区:[1]国网湖北省电力有限公司电力科学研究院,湖北武汉430077 [2]文华学院,湖北武汉430074

出  处:《湖北电力》2017年第9期43-46,共4页Hubei Electric Power

摘  要:结合两台配置不同制粉系统的超临界机组的RB试验情况,对超临界机组RB试验中的若干问题进行了探讨。介绍了RB试验的控制策略,指出正确设置主汽压滑压速率、锅炉主控目标负荷、给水控制速率,以及合理利用锅炉蓄热是RB试验中的关键问题。此外,应针对机组及设备的具体特点制定合适的控制策略。Based on analysis of the RB test of two supercritical units with different coal pulverizing systems, some problems of the RB test of the supercritical unit are discussed. Control strategiesof the RB test are introduced, and it is pointed out that the sliding pressure rate, target load of theboiler master, feedwater flow rate, and rational utilization of thermal storage of the boiler are thekey points in the RB test. In addition, appropriate control strategies should be developed for thespecific characteristics of the unit and equipments.

关 键 词:超临界机组 协调控制 RB 滑压控制 水煤比 

分 类 号:TM621.6[电气工程—电力系统及自动化] TK323[动力工程及工程热物理—热能工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象