检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄挺 曹园树 孙文龙 王琳[2] Huang Ting;Cao Yuanshu;Sun Wenlong;Wang Lin(China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd., Guangzhou, Chin)
机构地区:[1]中国能源建设集团广东省电力设计研究院有限公司 [2]湖南大学
出 处:《暖通空调》2018年第5期63-65,共3页Heating Ventilating & Air Conditioning
摘 要:基于全寿命周期成本的分析,对广东某火力发电厂厂前区供冷的综合初投资、运行费用、维护费用和全寿命周期成本进行对比分析。结合各方案施工的难易程度、设计的复杂程度及运维能力等方面,综合考虑为广东某火力发电厂厂前区选择适合的供冷系统冷源设计方案。Based on the life cycle cost (LCC) analysis, compares and analyses the initial investment, operating costs, maintenance costs and life cycle costs of cooling system for an auxiliary building area of a power plant in Guangdong. Considering the difficulty in construction, complexity of design, operation and maintenance ability of each scheme, selects a proper cold source of cooling system for the auxiliary building area of the power plant in Guangdong.
关 键 词:火力发电厂 厂前区 冷源系统 全寿命周期成本 供冷系统
分 类 号:TU831[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145