?800 mm大圆坯连铸机设备安装与调试技术要点  

The key technique of installation and commisioning of big round bloom caster of ?800 mm

在线阅读下载全文

作  者:张鹏[1] 王颖[2] ZHANG Peng;WANG Ying(Shanxi Taiyuan IRON and STEEL(GROUP)Co., Ltd., Taiyuan 030003, Shanxi, China;Steelmaking and Continuous Casting Engineering Division, Capital Engineering and Research Inc. Ltd., Beijing 100176, China)

机构地区:[1]山西太钢不锈钢股份有限公司,山西太原030003 [2]中冶京诚工程技术有限公司,北京100176

出  处:《连铸》2018年第2期72-76,共5页Continuous Casting

摘  要:重点介绍了Ф800 mm大圆坯连铸机设备安装,参数控制、调试试车及热试车的过程控制和经验,阐述了大圆坯连铸机安装调试过程中需要注意和重点控制的要点,以及如何确定拉矫机夹持引锭链模式的安全压力,以保证试车和后续的安全性。Mainly focuses on the experience obtained by installation,accuracy control,commissioning and hot test about the big round bloom caster of Ф800 mm. It also elaborates the items which need attention and critical control points druing installation and commissioning,as well as trail of the big round bloom caster. How to reckon the safe pressure when the dummy is clamps by the WSU was introduced.

关 键 词:大圆坯连铸机 安装 调试 热试车 

分 类 号:TF341.6[冶金工程—冶金机械及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象