干热高温沙漠地区铁路上碴整道施工技术探究  被引量:3

Construction Technology Research on Railway Laying Ballast and Adjusting Track in Dry Desert Area with High Temperature

在线阅读下载全文

作  者:张帅 Zhang Shuai(China Railway 18th Bureau Group International Engineering Co. Ltd. , Tianjin 300222, China)

机构地区:[1]中铁十八局集团国际工程有限公司,天津300222

出  处:《铁道建筑技术》2018年第4期110-113,共4页Railway Construction Technology

基  金:中铁十八局集团有限公司科技发展计划项目(G12-02)

摘  要:针对沙特南北铁路项目在干热高温沙漠地区进行无缝线路上碴整道施工过程中,容易出现"碴包沙"的现象,介绍了上碴整道施工改进技术,分析了沙漠试验段的质量检测方法,为今后类似工程的施工提供实践参考。In light of the phenomenon of "ballast-coated sand" which is easy to be found during laying ballast and adjusting track for continuously welded rail track in dry desert area with high temperature of Saudi Arabia north-south railway project, this paper introduced the improvement technology of laying ballast and adjusting track, analyzed the method of quality detection in desert test section. It could provide practical reference for construction of similar projects in the future.

关 键 词:干热高温 沙漠 铁路 上碴整道 

分 类 号:U215.54[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象