ZAWTIKA 1B导管架调平研究  

Study of Jacket Leveling for ZAWTIKA 1B Project

在线阅读下载全文

作  者:邵亮亮[1] 魏佳广[1] 郭浩[1] 严亚林[1] 孙文明 陈凯超 SHAO Liang-liang;WEI Jia-guang;GUO Hao;YAN SUN Wen-ming;CHEN Kai-chao(CNOOC Offshore Oil Engineering Co. , Ltd)

机构地区:[1]海洋石油工程股份有限公司

出  处:《化工自动化及仪表》2018年第5期389-392,415,共5页Control and Instruments in Chemical Industry

摘  要:由于五千到八千吨位类型的导管架的海上安装易受许多因素影响,导致导管架就位后的水平度不满足设计要求。导管架的调平技术直接关系着此类平台在海上较深水(水深60~200m)处安装的成败。为此,对导管架调平方式和各种调平方式的综合使用进行分析。Considering the fact that many factors influence the offshore installation of the jackets which ranging from 5 000t to 8 000t and this results in the levelness of the jacket positioned incapable of satisfying the design requirement and the jacket leveling decides the success or failure of installing oil plattorm at the depth of water 60m to 200m. The ways of jacket leveling and comprehensive utilization of various leveling ways were ana- lyzed.

关 键 词:导管架 水平度 调平 

分 类 号:TH89[机械工程—仪器科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象