检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王凌云 Wang Lingyun(Mining Corporation,Shougang Group Co.,Ltd)
机构地区:[1]首钢集团有限公司矿业公司
出 处:《现代矿业》2018年第5期155-157,共3页Modern Mining
摘 要:河北杏山铁矿采用无底柱分段崩落法开采,对于下盘倾角较缓的矿体,为提高矿石回采率,回采过程中可采用下盘切岩方法。根据矿石市场售价,计算了矿石不同混合品位时的下盘切岩高度,为端部回采边界确定提供了理论依据。此外,通过优化崩矿步距、调整放矿口、改进扇形孔边孔角参数,实现了降低矿石贫化率、提高回采率的目标,对于类似矿山有一定的借鉴价值。Non-pillar sublevel caving method is used in Xinshan Iron Mine in Hebei Province,in order to improve the ore stoping rate of the gently inclined ore-body in the footwall,cutting rock method can be adopted in the process of stoping. According to the ore market price,the cutting rock height with different mixing grade is calculated,so as to provide some theoretical reference for the determined of stoping boundary in the footwall. Besides that,in order to decrease the ore dilution rate and increase the ore recovery rate,some effective measures are adopted,such as optimizing the independent advance of ore breaking,adjusting the drawhole and improving the angle parameters of the blasting holes distributed with fan-shape. The above study results in this paper can provide some technical reference for the similar mines.
关 键 词:铁矿 缓倾斜矿体 无底柱分段崩落法 下盘切岩 回采边界 回采率 贫化率
分 类 号:TD861.1[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31