检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尹明泉 王春民 刘欢 Yin Mingquan;Wang Chunmin;Liu Huan(Beijing Power Equipment Group Co., Ltd., Beijing 102401, China)
出 处:《发电设备》2018年第3期227-230,共4页Power Equipment
摘 要:理论分析了DL/T 5145—2012《火力发电厂制粉系统设计计算技术规定》中所述热力计算方法与德国标准MPS型中速磨煤机热力计算的主要区别,并通过4个实际工程案例进行对比。结果表明:造成两种标准不同的因素主要有机械热、通风率和散热损失系数,与干燥剂始端温度基本无关。A theoretical analysis was conducted on the main difference of heat calculation ways respectively specified in DL/T 5145—2012 "Technical code for design and calculation of pulverized coal preparation system of fossil-fired power plant"and corresponding German standard,and subsequently a comparison was made among 4 actual engineering cases.Results show that the main difference between above two standards lies in the aspects of mechanical energy,ventilation rate and heat loss coefficient,which basically has no relationship with the start temperature of the drying agent.
分 类 号:TK223.25[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229