检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王海涵 WANG Haihan(Guangzhou Engineering Construction Headquarter, China Railway Guangzhou Group Co Ltd, Guangzhou Guangdong 510088, China)
机构地区:[1]中国铁路广州局集团有限公司广州工程建设指挥部,广东广州510088
出 处:《中国铁路》2018年第5期18-23,共6页China Railway
摘 要:结合佛山西站项目无站台柱雨棚施工,介绍BIM技术在工程建设管理中的应用。通过BIM技术,优选出累积滑移最佳安装方案;对钢结构雨棚分块安装的网壳纵、横向接口等部位进行深化设计;同时应用BIM技术,模拟雨棚钢结构工程的预安装过程,实现正式施工实施前的预可视化工程建设管理,优化正式施工流程,提高施工效率。According to the case of the construction of canopy without platform at Foshanxi Railway Station, the paper introduces the application of BIM technology in engineering construction management. The optical installation scheme of accumulative sliding can be selected by BIM technology; the paper makes deepening design of vertical and horizontal interfaces of reticulated shell installed into steel structure canopy, simulates the pre-installation process of steel structure canopy engineering and realizes pre-visual construction management before construction, which optimizes construction process and enhances efficiency of construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222