检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈绍刚[1] CHEN Shao-gang(Shaoguan Smehing Plant, Shaoguan 512024, China)
机构地区:[1]韶关冶炼厂,广东韶关512024
出 处:《甘肃冶金》2018年第3期17-21,共5页Gansu Metallurgy
摘 要:通过对ISP熔炼工序主要设备:密闭鼓风炉、电热前床、冷凝分离系统的结构优化、新型耐火材料的应用及有效的炉窑特别护理措施,使ISP熔炼工序大修周期由3年延长到6年以上,个别设备可达15年以上,基本解决了ISP熔炼大修周期短、维修费用高的弊端。The structure optimization of main equipment in ISP smelting process was carried out,such as closed blast furnace,electric heating front bed and condensation separation system.Application of new refractory material and effective nursing measures for kiln.Through the above measures,the overhaul cycle of ISP smelting process has been extended from 3 years to more than 6 years,and the individual equipment can be more than 15 years,basically solved the disadvantages of ISP smelting overhaul cycle short and the high maintenance costs.
关 键 词:密闭鼓风炉 电热前床 冷凝分离系统 结构优化 高铝砖 高铝质浇注料 大修周期 措施
分 类 号:TF812[冶金工程—有色金属冶金] TF813
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15