检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张鹏鹏[1,2] 郝兵元 王凯[3] 黄小朋 闫树鹏[2] 魏娟 ZHANG Pengpeng;HAO Bingyuan;WANG Kai;HUANG Xiaopeng;YAN Shupeng;WEI Juan(College of Mining Engineering, Taiyuan University of Technology, Taiyuan 030024, China;Zhongxing Coal Industry, Fenxi Mining Industry Co., Ltd., Jiaocheng 030500, China;Department of Mining Engineering, Shanxi Institute of Technology, Yangquan 045000, China)
机构地区:[1]太原理工大学矿业工程学院,山西太原030024 [2]汾西矿业集团有限责任公司中兴煤业公司,山西交城030500 [3]山西工程技术学院矿业工程系,山西阳泉045000
出 处:《煤炭科学技术》2018年第5期40-46,共7页Coal Science and Technology
基 金:山西省科技重大专项资助项目(20121101009-03);山西省自然科学基金重点资助项目(2014011044)
摘 要:为合理确定区段小煤柱宽度及沿空巷道支护方式,以阳泉五矿8407综放工作面为例,基于采空侧基本顶断裂力学模型及围岩极限平衡理论,理论计算了合理煤柱宽度的上下限值,采用钻孔应力监测方法,对回采过程中煤柱内部应力分布进行了实测,进而确定沿空巷道支护参数。研究结果表明:沿空掘巷小煤柱宽度合理范围为9.03~11.80 m,取10 m为宜,煤柱侧0~3 m范围煤体发生塑形破坏、3~6 m范围为弹性核区、6~10 m范围靠近8409采空区承载能力弱,因而在8407回风巷掘巷期间采用锚杆+长短锚索一次支护,回采期间对煤柱帮进行3 m钻孔注浆加固二次支护,现场实测数据显示,8407回风巷沿空掘进期间围岩变形量较小,回采期间顶板、注浆加固煤柱帮、实体煤帮最大变形量分别为0.20、0.05、1.00 m,围岩变形处于可控范围,实现了综放工作面安全高效回采。In order to determine reasonable width of small coal pillar and support method of gob-side entry driving,taking No.8407 working face of Yangquan No.5 Mine as the example,based on main roof fracture model and the ultimate balanced theory,calculated the upper and lower limit values of coal pillar,the stress distribution of coal pillar was studied during the mining period by adopting the method of borehole stress measurement.The support parameters of gob-side entry driving was also calculated.Results showed that the width of small coal pillar should be chosen between 9.03 m and 10.81 m,the optimal width of coal pillar was 10 m,the coal pillar range from 0 to 3 m was damaged,range from 3 to 6 m was elastic core area,range from 6 to 10 m close to No.8409 goaf and the carrying capacity was weak.Thus,the anchor and long and short anchor cable were used to support the roadway during the time of excavation,and then the coal pillar was reinforced by grouting of 3 m drilling during period of mining.Monitoring results confirmed that deformation of roadway changed slightly during the time of excavation,the maximum deformation of roof and grouted small coal pillar side and coal side were 0.20 m,0.05 m and 1.00 m,the deformation of surrounding rock was controllable,realized safety and efficient mining in fully-mechanized top coal caving.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222