检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘宇 Liu Yu(Reservoir administration in Dahuofang of Liaoning Province, Fushun 113007)
出 处:《中国防汛抗旱》2018年第5期35-38,共4页China Flood & Drought Management
摘 要:结合浑河新立堡桥所在位置,确定计算范围与条件,利用河道一维恒定流模型对建桥前后壅水高度及影响范围进行计算。根据计算结果,分析了50年一遇、100年一遇和300年一遇标准洪水时,建桥后水位最大壅高值、桥前水位、影响范围以及左右岸堤防布设,并采用物理模型实验成果进行了验证与分析,结果符合实际情况,可作为建桥后两岸堤防建设的可靠依据。Based on the geographic location of Xinlibao bridge in the Hun-River,range and conditions of calculation were determined,one-dimensional steady flow was used to calculate backwater height and scope. According to the calculation results,under the condition of the 50-year,100-year,and 300-year return period flood standard,the maximum water level after the bridge obstruct high value,the bridge water level,the scope of both banks and dikes were analyzed,which were verified by physical model experiment results. Finally,the impact assessment of flood control was also analyzed due to the construction of the bridge in Shenyang City.
关 键 词:浑河 防洪计算 桥梁雍水 一维数学模型 评价分析
分 类 号:U442.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249