检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王彦祥[1,2] 何琴 颜炳魁 WANG Yan-xiang;HE Qin;YAN Bing-kui(Tianjin Municipal Engineering Design & Research Institute, Tianjin 300392, China;Tianjin Enterprise key laboratory ~f Infrastructure Durability, Tianjin 300392, China;College of Environmental Science and Engineering, China West Normal University, Nanehong 637009, China)
机构地区:[1]天津市市政工程设计研究院,天津300392 [2]天津市基础设施耐久性企业重点实验室,天津300392 [3]西华师范大学环境科学与工程学院,四川南充637009
出 处:《中国给水排水》2018年第12期69-73,共5页China Water & Wastewater
摘 要:海榆东线市政道路改造工程在设计阶段进行了全专业BIM应用,提出各阶段建模标准,通过梳理专业间配合关系,整理模型总装架构,确立模型创建流程;对于建模软件的选择,倡导通用技术平台、协同设计环境与统一数据格式等理念,降低信息传递过程中的损耗;在BIM工作环境下进行专业协同设计,强化专业间配合,提出设计深化思路;通过BIM应用,证实了BIM在市政综合项目中的适用性,设计与BIM的交互应用有效地改善了设计质量,对管线综合设计提出新的工作方式,提高了设计校审的工作效率。BIM was fully applied ill the retrofit project of Haiyu east line municipal road during de- sign stage. Model standards were created at different stage. Through sorting out the relationship between different majors, model structure was arranged, and the model building workflow was established. For BIM software selection, general technology- platform, collaborative design environment and a unified data format conception were put forward, which could reduce the loss in the process of information transfer. Majors collahorative design was realized in BIM environment so as to strengthen the coordination work. As a result, the deepening design was put forward. Through the BIM application, the suitability of BIM in the municipal comprehensive project was confirmed. The interactive application of design and B1M had im- proved the design quality effectively, and the new working method for underground pipelines comprehen- sive design was proposed. Therefore, the efficiency of design audit process was improved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15