检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李志刚[1] LI Zhi-gang(Beijing Huayu Engineering Co., Ltd., China Coal Technology and Engineering Group, Beijing 100120, China)
机构地区:[1]中国煤炭科工集团北京华宇工程有限公司,北京100120
出 处:《煤炭工程》2018年第6期135-138,共4页Coal Engineering
摘 要:通过对几种典型情况下的大型煤矿各专业施工图进行统计分析,得到了各专业施工图设计工作量的比例,即:虽然不同煤矿施工图总量不同,但各专业所占比例基本稳定,其中采矿、土建、机电、机制四个专业所占比例较大;虽然煤矿建设规模和开拓方式不同,但地面施工图占总施工图比例稳定在70%~85%。各专业施工图工作量分析对矿井建设期间建设单位抓住施工重点,提高矿井建设速度有着重要意义,对设计单位合理划分施工图阶段各专业工作量并进行效益工资合理分配也有一定参考意义。Through the statistical analysis of the professional construction drawings of large-scale coal mines in several typical cases,the proportion of design workload of professional construction drawings has been basically figured out,that is,although the total amount of construction drawings of different coal mines is different,but each professional accounted for the proportion is basically stable, of which mining, civil engineering, electromechanical and mechanical systems account for a large proportion; although the construction scale and development methods of coal mines are different,the proportion of ground construction drawings in total construction plans is within the range of 70% ~ 85%. Analysis of the workload of professional construction drawings has important significance for the construction unit to grasp the key of construction and improve the speed of mine construction. It also has certain reference value for the design agencies to rationally divide the professional workload of the construction drawings and carry out reasonable distribution of benefit wages.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222