检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张桂荣 Zhang Guirong(Fujian Geological Prospecting Institute, Central Bureau of Geological and Mining, Fujian Fuzhou 350013)
机构地区:[1]中化地质矿山总局福建地质勘查院,福建福州350013
出 处:《江西建材》2018年第7期82-83,共2页Jiangxi Building Materials
摘 要:随着城市资源的紧缩,人们在向地下和空中"索要"资源的同时,也随之出现了诸多问题,如人工挖孔桩等对临近已有建筑物、地下设施的破坏等,因此分析人工挖孔桩施工对临近建筑物的影响因素就显得十分重要,基于此,本文研究了人工挖孔桩施工对临近建筑物的影响因素。With the tightening of urban resources,people are "asking for"resources in the ground and in the air,there are many problems,such as manual digging pile and so on adjacent to the existing buildings,underground facilities,and so on,so the analysis of the artificial excavation pile construction on the adjacent buildings are very important factors,based on this,In this paper,the influence factors of artificial digging pile construction on adjacent buildings are studied.
关 键 词:人工挖孔桩 临近建筑物 影响分析 水平位移 地面沉降
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3