作 者:潘鹏程[1] 玄立颖 陈红帅[1] PAN Pengcheng;XUAN Liying;CHEN Hongshuai(Yanshan University, Qinhuangdao 066004, Chin)
机构地区:[1]燕山大学,河北秦皇岛066004
出 处:《工程经济》2018年第5期66-70,共5页ENGINEERING ECONOMY
基 金:河北省社会科学发展研究课题"PPP项目公私双方合作稳定性研究"(201703120105)
摘 要:PPP项目合作周期长、投资大、不确定因素多,公私双方合作稳定性受到各种因素的影响。界定PPP项目公私双方合作关系稳定性内涵,通过案例分析、文献归纳两种方式初步确定影响公私双方合作稳定性的影响因素;进而简化、补充、归纳,分别得到规划设计阶段、建设阶段、运营阶段的26个影响因素,为政府部门和私营部门维持稳定的合作关系提供参考。PPP project has long cooperation period,large investment and uncertain factors in the process. The stability of the cooperation between public and private parties is affected by various factors. This paper defines the stability connotation of PPP cooperation between public and private parties,determines preliminary the factors influencing the stability of public-private cooperation by case study and literature summarization. Then obtains respectively 26 inf luencing factors of the planning and design stage,the construction stage and the operation stage by simplifying,supplementing and inducing,in order to provide references for keeping a stable cooperation between public and private parties.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3