立井掘砌凿井设备混合悬吊技术综述  

Summary of Mixed Suspension Technology of Sinking Equipment for Shaft Digging

在线阅读下载全文

作  者:彭彭 冯旭东 周柳涛 Peng Peng;Feng Xudong;Zhou Liutao(NO.29 Construction Department of China Coal Mine Construction Group Corporation, Suzhou 234000, China;National Engineering Laboratory for Deep Shaft Construction Technology in Coal Mine, Huaibei 235000, China;China Coal Mine Construction Group Corportation Limited, Hefei 230022, China;China Coal No.71 Engineering Company Limited, Suzhou 234000, China)

机构地区:[1]中煤矿山建设集团二十九工程处,安徽宿州234000 [2]煤矿深井建设技术国家工程实验室,安徽淮北235000 [3]中煤矿山建设集团有限公司,合肥230022 [4]中煤第七十一工程处有限责任公司,安徽宿州234000

出  处:《煤矿机械》2018年第6期56-57,共2页Coal Mine Machinery

摘  要:袁店一井煤矿东风井井筒掘砌施工期间,采用混合悬吊的方式悬吊凿井设备,不仅节省了大量临时设备,还为井筒的顺利掘砌创造了良好条件,达到了安全、快速安全施工的目的。During Yuandian Yijing coal mine Dongfeng shaft digging, the mixed suspension of sinking equipment,not only saves a large number of temporary equipment,but also created favorable conditions for the smooth shaft excavation,to achieve a safe,fast construction purpose.

关 键 词:立井施工 混合悬吊 井筒 钢丝绳 

分 类 号:TD262[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象