检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈召磊 张豪 Chen Zhaolei;Zhang l-Iao(Yongcheng Coal Company, Henan Energy Coal Chemical Industry Group, Yongcheng 476600, Chin)
机构地区:[1]河南能源化工集团永煤公司,河南永城476600
出 处:《煤矿机械》2018年第6期116-118,共3页Coal Mine Machinery
摘 要:针对塔式立井提升机卸载煤仓大块矸石难以处理的问题,研究了20世纪90年代初期由德国进口的四绳摩擦塔式立井提升机卸载煤仓矸石处理的改进方法,解决了在井塔高处卸载煤仓篦子上大块矸石人工搬移、破碎困难的问题,使得煤流系统运行更加稳定,最大限度减少人力投入,确保人身安全。Aiming at the difficulty of handling the tower gang unloading large boulders in the coal bunker, an improved method for unloading coal gangue from the four-rope friction tower shaft elevator imported from Germany in the early 1990 s was studied, and the height of the well tower was solved.The problem of manual removal and crushing of large pieces of vermiculite from the unloading of coal bunker dumps has made the operation of the coal flow system more stable, minimizing manpower investment and ensuring personal safety.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229