南水北调东线江苏段泵站工程柔性定岗研究  被引量:3

Flexible fixed posts of pump stations in Jiangsu section of Eastern Route Project of South-to-North Water Diversion

在线阅读下载全文

作  者:王亦斌 方国华[2] 孙涛 徐铭 黄显峰[2] 

机构地区:[1]南水北调东线江苏水源有限责任公司,江苏南京210009 [2]河海大学水利水电学院,江苏南京210098

出  处:《水利经济》2018年第3期39-44,共6页Journal of Economics of Water Resources

基  金:江苏省南水北调工程科技创新项目(NSBD-2016-01)

摘  要:分析了南水北调东线江苏段泵站工程定岗定员存在的问题,阐述了泵站柔性定岗的理念及特征,探讨了柔性定岗管理模式下泵站决策层和操作层人员工作量的测算方法,构建了泵站岗位定员优化模型。以南水北调金湖站为例开展实证研究,制定金湖站柔性定岗方案,最大限度降低人力成本,实例验证了该定员方法的有效性。The existing problems in the fixed posts of pump stations in Jiangsu section of Eastern Route Project of South-toNorth Water Diversion are analyzed. The concept and characteristics of the flexible fixed posts of pumping stations are introduced. The methods for calculate the workload of the decision-making and operating levels of pumping stations under the flexible fixed posts are discussed,and the optimization model for the fixed posts of pump stations is established. Based on the case study of Jinhu Station of South-to-North Water Diversion Project,the empirical analysis is carried out to develop the scheme of the flexible fixed posts at Jinhu Station so as to minimize the labor costs,and the effectiveness of the proposed method is validated.

关 键 词:泵站工程 柔性定岗 优化模型 降本增效 南水北调工程 江苏省 

分 类 号:TV675[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象