检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨林[1] YANG Lin(Signal & Communication Research Institute, China Academy of Railway Sciences, Beijing 100081, China)
机构地区:[1]中国铁道科学研究院通信信号研究所,北京100081
出 处:《中国铁道科学》2018年第3期125-130,共6页China Railway Science
基 金:国家自然科学基金高速铁路联合基金资助项目(U1534202);中国铁路总公司科技研究开发计划项目重点课题(Z2016-T004);中国铁道科学研究院行业服务技术创新项目(2016YJ060)
摘 要:基于高速铁路地震预警监测系统的结构和功能,提出1种高速铁路地震预警系统紧急处置信息快速生成算法。该算法采用曲线拟合方法建立平面坐标系下高速铁路线路的曲线方程,基于地震动能量衰减方程建立平面坐标系下地震影响范围的圆曲线方程,联立2个方程并求解,得到2条曲线2个交点的坐标值;将坐标值转换为经纬度,再转换为公里标,得到地震对高速铁路线路的影响范围;再依据高速铁路预警地震紧急处置原则,生成高速铁路地震预警紧急处置信息。将该算法应用于高速铁路地震预警监测铁路局中心系统的测试和现场地震试验中,紧急处置信息生成时间的最大值均为40ms,平均值分别为18和27ms,可见其远远小于《高速铁路地震预警监测系统暂行技术条件》中对路局中心系统紧急处置时间100ms的要求,从而验证了该算法的合理性和有效性。Based on the structure and function of the earthquake early warning and monitoring system for high speed railway,a fast generation algorithm was proposed for the emergency disposal information in earthquake early warning system for high speed railway.The curve fitting method was used to establish the curve equation of high speed railway line in plane coordinate system.Based on the energy attenuation equation of ground motion,the circular curve equation of the earthquake affected range in plane coordinate system was established.Two equations were connected and solved,and the coordinate values of 2 intersection points of 2 curves were obtained.The coordinate values were transformed into longitude and latitude and then converted to kilometer scale,and the influence range of earthquake on high speed railway line was obtained.According to the principles of early warning and earthquake emergency disposal for high speed railway,the emergency disposal information of earthquake early warning for high speed railway was generated.The algorithm was applied to the tests and the field seismic experiments for the center system of railway administration in the earthquake early warning and monitoring of high speed railway.The maximum time for generating emergency disposal information was 40 ms,with an average of 18 and 27 ms respectively,which was far less than the required emergency disposal time of 100 ms for the center system of railway administration in "Interim Technical Conditions for High Speed Railway Earthquake Early Warning and Monitoring System",which verified the rationality and validity of the algorithm.
关 键 词:高速铁路 地震预警系统 地震影响范围 紧急处置信息 信息生成时间
分 类 号:U298.1[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.81.2