检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨睿[1] YANG Rill(No.6 Mine, Pingdingshan Tian'an Coal Industry Company Limited, Pingdingshan 467091, China)
机构地区:[1]平顶山天安煤业股份有限公司六矿,河南平顶山467091
出 处:《煤炭技术》2018年第7期31-34,共4页Coal Technology
摘 要:针对深部孤岛综采工作面在末采期间,位于三角区且遇到断层,利用层位对比和断层揭露情况分析断层走势,合理确定停采线位置,优化了收尾过断层方案。首次实施由顶板注浆改为煤壁注浆施工工艺,确保过断层有效控制顶板。两巷采取掏槽木垛、加长超前支护、支架架脚点柱措施,为顺利收尾创造了条件。给出了抹角大小确定方法,不但保证了设备回撤空间,而且减少了工程量。In view of the deep island comprehensive mining face in the late mining period ,it is located in the triangle area and encounters faults. For the first time, the top grouting technology was changed from top grouting to coal wall grouting technology to ensure the effective control of top grouting. The two lanes adopt the measures of cutting wood pallets,lengthening leading support and stent foot column,which create the conditions for a smooth end. The method of determining the indirect size is given, which not only guarantees the return space of the equipment,but also reduces the quantity of the project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249