检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于志强[1] 伍定一 周绪红[1,3] 高晋东 王忠全 YU Zhiqiang;WU Dingyi;ZHOU Xuhong;GAO Jingdong;WANG Zhongquan(College of Civil Engineering, Hunan U uiversity, Changsha 410082, China;Changde Planning and Arehiteeture Design Institute Co. Ltd, Changde 415000, China;College of Ciril Engineering, Chnngqing University, Chongqing 400044, China;Belling Building Construction Reseaeh Institute Co. Ltd, Belling 100039, China;Shanghai Tonglei Civil Engineering Technology Co. Ltd, Shanghai 200092, China)
机构地区:[1]湖南大学土木工程学院,长沙410082 [2]常德市规划建筑设计院有限责任公司,湖南常德415000 [3]重庆大学土木工程学院,重庆400044 [4]北京市建筑工程研究院有限责任公司,北京100039 [5]上海同磊土木工程技术有限公司,上海200092
出 处:《工业建筑》2018年第6期124-129,190,共7页Industrial Construction
摘 要:采用MIDAS/Gen和ANSYS有限元分析软件对常德芦荻山收费站全张拉预应力索膜结构的预应力施加过程进行数值模拟,对该结构的初始应力状态进行反复试算,得出最佳索力初始应力;为确保施工过程中的索力预张力施工的可靠性及施工安全性,对该结构中主结构索力施加的施工全过程索力、位形以及桅杆应力监测。研究表明:整体张拉结构形式预应力的施加宜采用先同步张拉背索,然后张拉谷索的方法使整体结构成形;在预应力施加初始阶段结构变形量较大,预应力的施加过程应分级缓慢加载;张拉过程中,桅杆在动态过程中应力变化比较复杂,对钢桅杆的应力监测十分必要。模拟结果与监测结果吻合较好,表明该数值模拟方法切实可行,施工过程中结构关键杆件应力、索力及位移在可控范围之内,施工方案可以很好地满足设计要求。MIDAS/Gen and ANSYS software were used to carry out the numerical simulation of the prestressed tension and the cable-membrane structure of the pretressing cable tension of the Changde Ludishan Toll Station Building's construction progress,and by experimenting test repeatedly on the structure's original stress state,the best original stress of cable tension was obtained. In order to ensure the reliability and secuirity of cable tension of the construction during the work progress, the cable tesion monitoring, configuration monitoring and mast stress monitoring were carried out all through the work progress. The research results indicated that,it was proper to adopt synchronous stretch-draw dorsal funiculus,and then the way of stretch-draw valley was capable of shaping the whole contructure. In the prilimelary stage of exerting prestressed force,when the deflection was comparatively large,exerting prestressed force should be slowly gradation loading. In the prosess of tession,the dynamic variation of stresses of the mast was complicated,so it was necessary to carry out the stress monitoring of the steel mast. The simulation results agread well with the monitoring results,it indicated that the way of numerical simulation was practicable. The key structure levers force and cable tension and displacement were controlable during the construction,and the construction program could greatly meet the requirements of the design.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62