检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何武山 HE Wu-shan(China Railway Siyuan Survey And Design Group Co., LTD. Wuhan 43006)
出 处:《铁道勘测与设计》2018年第1期68-69,77,共3页Railway Survey and Design
摘 要:结合萧甬铁路余姚动车所工程探讨了动车所内临修库与检查库合设的可能性,提出了一种对检查库空间占用率低、不破坏检查库内作业平台及轨道桥结构、转向架更换效率高的转向架更换方案,在实际工程应用中不仅减少占地,而且可在一定程度上降低工程投资。In a traditional electric multiple unit(EMU) deport, both repair factoryand temporary repairing factory are necessary. Nevertheless, it's difficult to construct both of them in real engineering under certain conditions, for example, when the land is seriously limited. Thus, a scheme is proposed to merge temporary factory with repair factory,which can not only reduce space occupancy, but also protect the structure of platform and rail bridge. In practical engineering, the project can reduce both the utilization of land and investment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.91.46