检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐峰[1] 阮胜福[1] 胡永明 靳宝旺 田维兴[1] XU Feng;RUAN Sheng-fu;HU Yong-ming;JIN Bao-wang;TIAN Wei-xing(Offshore Oil Engineering Co. , Ltd. , Tianjin 300451, China)
出 处:《海洋工程装备与技术》2018年第3期191-196,共6页Ocean Engineering Equipment and Technology
摘 要:导管架海上安装时,在海床基础上预先设置基盘导向桩,并在导管架上设置套筒,可以有效地辅助导管架精确定位,实现水下井口预钻井,缩短油气田开发周期。针对安装过程中导管架与水下导向桩对接时的相互作用,采用MOSES软件,通过时域模拟,分析对接过程中的运动和碰撞载荷,并将数值分析结果与相关规范计算结果进行了对比。分析结论对于今后的导管架水下对接项目具有一定的参考价值。For offshore installation of jackets,subsea template guide pre-installed on seabed and sleeves designed on the jacket are beneficial to the rapid and accurate positioning of the jacket.Subsea wellheads can be pre-drilled and the development period of oil and gas field can be shortened by adopting this installation method.To investigate the interaction between jacket and guide pile during docking,MOSES software is used for the analysis of motion and impact load in time domain.The analysis results are compared with the results according to the relevant standards.The conclusions of this research have a certain reference value for the projects using subsea docking installation method.
分 类 号:TE53[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145