跨高速箱梁顶升施工技术研究  被引量:1

Study of Construction Technique for Jacking of Box Girders Crossing Expressway

在线阅读下载全文

作  者:王永[1] 柴金玲[1] 宁金成[1] WANG Yong;CHAI Jinling;NING Jincheng(He' nan Communication Vocational Technology College,Zhengzhou, He' nan 450000,Chin)

机构地区:[1]河南交通职业技术学院,河南郑州450000

出  处:《施工技术》2018年第13期132-134,共3页Construction Technology

基  金:河南省交通运输科技项目(2018J3)

摘  要:因桥下净空不足,为避免梁底局部刮擦,对混凝土连续箱梁进行调坡顶升,通过荷载计算和千斤顶配置,采取了循环顶升的方案,以保证各墩台处保持速度与位移量按比例顶升,从而避免不均匀顶升造成梁体构件的破坏。Because of the problems form the clearance of bridge,in order to avoid local scratch of the bottom,measures for concrete continuous box girder lifting were adopted. Through the allocation of load calculation and jack,this paper takes the circular jacking scheme to ensure each pier maintain speed and displacement amount according to the proportion of top rise,so as to avoid uneven jacking caused by box girder component failure.

关 键 词:桥梁工程 箱梁 千斤顶 循环顶升 位移 施工技术 

分 类 号:U448.14[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象