动臂塔式起重机安装及转换施工技术  被引量:1

INSTALLATION AND TRANSITION CONSTRUCTION TECHNIQUE OF LUFFING JIB TOWER CRANE

在线阅读下载全文

作  者:张雪斌 汪潇驹 贾向辉 梁权[1] 李化明 马嘉霖 ZHANG Xue-bin;WANG Xiao-ju;JIA Xiang-hui;LIANG Quan;LI Hua-ming;MA Jia-lin(Beijing Fourth Construction & Engineering Co.,Ltd.,100075,Beijing,China)

机构地区:[1]北京建工四建工程建设有限公司,北京100075

出  处:《建筑技术》2018年第7期727-729,共3页Architecture Technology

摘  要:国瑞·西安金融中心超高层建筑施工中,考虑施工机械的技术性能、工作原理、钢结构的分节,并结合建筑物的结构形式、施工工艺和施工环境,综合考虑塔式起重机的布置及转换时间节点,结合施工结构特点合理划分流水和钢结构分段,利用塔式起重机转换时间合理调整施工顺序,保证了塔式起重机转换期间现场正常施工。Glory Xi'an Financial Center is a super-high building. Considering the technical performance and working principle of construction equipment, segmentation of steel structure, structural type of building, construction process and environment, arrangement and transition time node of tower crane, as well as the feature of construction structure, construction sequence and steel structure were reasonably divided, the transition time of tower crane was effectively used to adjust the construction sequence. Normal construction was guaranteed during the tower crane transition.

关 键 词:起重机械选择 起重机转换 流水施工 

分 类 号:TU731.1[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象