钢板混凝土组合剪力墙施工技术  被引量:6

CONSTRUCTION TECHNIQUE FOR STEEL PLATE-CONCRETE COMPOSITE SHEAR WALL

在线阅读下载全文

作  者:汪潇驹 马骏 张雪斌 张进红[1] 李寅啸 WANG Xiao-ju;MA Jun;ZHANG Xue-bin;ZHANG Jin-hong;LI Yin-xiao(Beijing Fourth Construction & Engineering Co.,Ltd.,100075,Beijing,China)

机构地区:[1]北京建工四建工程建设有限公司,北京100075

出  处:《建筑技术》2018年第7期737-740,共4页Architecture Technology

摘  要:国瑞·西安金融中心塔楼核心筒施工中,针对钢板易变形、钢筋穿筋及模板固定困难,墙体混凝土浇筑时易裂缝等问题,通过样板墙试验确定混凝土配合比,采用BIM技术降低钢筋绑扎难度,保证了组合剪力墙浇筑质量。During steel plate-concrete composite shear wall construction of Glory Xi'an Financial Center, pipelining construction steps and steel structure segmentation were reasonably determined according to the construction structure characteristics with consideration of the following aspects, such as engineering characteristics, technical performance of construction equipment, segmentation of steel structure, structure type, construction process and environment, arrangement and transition time node of tower crane. The transition time of tower crane was effectively used to adjust the construction sequence, successfully realizing continuous construction during tower crane transition and obtaining favorable practical benefits.

关 键 词:钢板剪力墙 构件吊装 模板工程 

分 类 号:TU745.1[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象