检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁子鹏 陈皓勇[1] 雷佳 张聪[1] 赵文猛 LIANG Zipeng;CHEN Haoyong;LEI Jia;ZHANG Cong;ZHAO Wenmeng(School of Electric Power, South China University of Technology, Guangzhou 510641, Guangdong Province, China;Patent Examination Cooperation Center of the Patent Office, S IPO, Guangzhou 510530, Guangdong Province, China;Electric Power Research Institute, CSG, Guangzhou 510663, Guangdong Province, China)
机构地区:[1]华南理工大学电力学院,广东省广州市510641 [2]国家知识产权局专利局专利审查协作广东中心,广东省广州市510530 [3]南方电网科学研究院有限责任公司,广东省广州市510663
出 处:《电网技术》2018年第7期2111-2119,共9页Power System Technology
基 金:国家重点研发计划项目(2016YFB0900100)~~
摘 要:随着风电并网渗透率的快速增长,系统的随机波动性显著增强。为合理地协调旋转备用配置效益和风险的矛盾,首先以多面体不确定集刻画风电不确定性,构建了计及风电出力误差概率的期望弃风和期望切负荷模型。在综合考虑风电、火电、水电等多类型电源机组运行特性的基础上,以发电效益与潜在期望风险为备用目标,建立了考虑风电不确定度的风-火-水-气-核-抽水蓄能多类型电源机组协同调度的旋转备用优化模型,并提出了一种自适应遗传算法与分枝切割算法相结合的双层优化算法以求解所建模型。算例结果表明,所提备用方法能自适应地寻找风电最优不确定度,合理地权衡备用策略的经济效益和风险成本,同时所建模型能适应在不同风电预测精度、不同切负荷成本系数以及不同风电调峰特性下的旋转备用优化配置,实现综合效益最优。With rapid growth of wind power penetration, randomness and volatility of power system are significantly enhanced, possibly leading to growing contradiction between benefit and risk of spinning reserve. In this paper, uncertainty of wind power is described with polyhedron uncertainty set instead of conventional box uncertainty set, and an expected risk model based on probability of wind power is constructed. In order to reasonably make a trade-off between benefit and risk in spinning reserve optimization, an uncertainty-set optimization model of wind power with cooperatively scheduling of multi-power units is established by evaluating potential risk of wind power uncertainty. Besides, a two-level optimization method combining adaptive genetic algorithm and branch cut algorithm is proposed to solve the MINLP model. Results indicate that, the proposed method can adaptively search for the optimal uncertainty-set of wind power, able to reasonably balance the benefit and risk of spinning reserve. The proposed model is adaptable to different wind power prediction accuracy, different load costing coefficients and different wind power inversion characteristics, so as to achieve optimal comprehensive cost.
分 类 号:TM721[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188