检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张月强 ZHANG Yue-qiang(Zhong Jiao Jian Ji Jiao Highway Investment Development Co.,Ltd Dingzhou Hebei 073000 Chin)
机构地区:[1]中交建冀交高速公路投资发展有限公司,河北定州073000
出 处:《石家庄铁路职业技术学院学报》2018年第2期23-27,共5页Journal of Shijiazhuang Institute of Railway Technology
摘 要:高速公路桥梁桩基施工工艺中,冲击成孔水下混凝土灌注桩施工技术应用甚广。本文就太行山高速K30+508.997沙河特大桥(跨越沙河而设)冲击成孔桩基施工过程中测量放线、桩机就位、冲击成孔、钢筋笼制作、吊装、导管吊装、水下混凝土灌注等具体施工技术进行总结研究,为类似工程施工提供技术参考。In the construction technology of expressway bridge pile foundation, the construction technology of underwater bored concrete pile is widely applied. In connecting with the project of Taihang Mountain high-speed K30 + 508.997 Shahe Extra Large Bridge(across Shahe River), this paper summarizes the specific construction technologies in the process of impact pore forming pile construction such as measuring unreeling, pile machine in position, impact pore forming, the reinforcing cage manufacture, assembly, catheter assembly, and underwater concrete perfusion, which provides technical reference for the similar engineering construction.
分 类 号:U443.154[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3