全断面岩石掘进机在国内隧道工程中的应用与发展  被引量:15

Application and development of full-face rock TBM in domestic tunnel engineering

在线阅读下载全文

作  者:张照煌[1] 李振 高青风[1] ZHANG Zhaohuang;LI Zhen;GAO Qingfeng(School of Energy,Power & Mechanical Engineering,North China Electric Power University,Beijing 102206,China)

机构地区:[1]华北电力大学能源动力与机械工程学院,北京102206

出  处:《矿山机械》2018年第7期1-6,共6页Mining & Processing Equipment

基  金:国家自然科学基金项目(51475163)

摘  要:TBM在我国的应用和发展已达半个多世纪,在此过程中积累了大量的相关经验。根据发展特点,将TBM的发展过程概括为探索期、引进期、联合期和自主发展期。结合各时期工程中的典型施工案例,叙述了在我国TBM发展过程中对施工地质地层信息的认识、获取方法和技术的发展,指出了TBM及其应用技术在我国的发展历程,为关心TBM发展及其技术应用的工程技术人员提供参考。The tunnel boring machine(TBM) has been applied and developed more than half a century in China, and a great deal of relevant experience has been accumulated during the process. According to the development characteristics of TBM, the development process of TBM was separated as exploration period, introduction period, joint period and autonomous development period. In combination with the typical construction cases during various periods, the paper described the cognition of the geological strata information, the acquisition method and technological development during the development process of TBM in China, and pointed out the development course of TBM and its application technology in China. It offered reference for engineers and technicians who concerned about the development and application of TBM.

关 键 词:TBM 隧道工程 应用 发展 

分 类 号:TD421.5[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象