检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张照煌[1] 李振 高青风[1] ZHANG Zhaohuang;LI Zhen;GAO Qingfeng(School of Energy,Power & Mechanical Engineering,North China Electric Power University,Beijing 102206,China)
机构地区:[1]华北电力大学能源动力与机械工程学院,北京102206
出 处:《矿山机械》2018年第7期1-6,共6页Mining & Processing Equipment
基 金:国家自然科学基金项目(51475163)
摘 要:TBM在我国的应用和发展已达半个多世纪,在此过程中积累了大量的相关经验。根据发展特点,将TBM的发展过程概括为探索期、引进期、联合期和自主发展期。结合各时期工程中的典型施工案例,叙述了在我国TBM发展过程中对施工地质地层信息的认识、获取方法和技术的发展,指出了TBM及其应用技术在我国的发展历程,为关心TBM发展及其技术应用的工程技术人员提供参考。The tunnel boring machine(TBM) has been applied and developed more than half a century in China, and a great deal of relevant experience has been accumulated during the process. According to the development characteristics of TBM, the development process of TBM was separated as exploration period, introduction period, joint period and autonomous development period. In combination with the typical construction cases during various periods, the paper described the cognition of the geological strata information, the acquisition method and technological development during the development process of TBM in China, and pointed out the development course of TBM and its application technology in China. It offered reference for engineers and technicians who concerned about the development and application of TBM.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222