检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马罗扣 申林[1] Ma Luokou;Shen Lin(Jiangdu Water Conservancy Engineering Management Office,Yangzhou 225200,Chin)
机构地区:[1]江苏省江都水利工程管理处,江苏扬州225200
出 处:《江苏科技信息》2018年第22期46-48,共3页Jiangsu Science and Technology Information
摘 要:众所周知,大型水利泵站的重要组成部分就是机电设备,机电设备的安装与检修水平的好坏直接影响到大型水利工程的运行情况。因此,大型水利泵站机电设备的安装与检修工作变得尤为重要。基于此,文章首先阐述了大型水利泵站机电设备安装与检修的要点,然后研究在平时工作过程中容易出现的问题,最后对大型水利泵站机电设备安装与检修的技术措施进行分析总结,希望对大型水利工程的长期稳定发展起到一定的促进作用。It is well known that the important component of large water conservancy pumping station iselectromechanical equipment, and the installation and maintenance level of electromechanical equipment directlyaffect the operation of large water conservancy project. Therefore, the large-scale water pumping station 4 mechanicaland electrical equipment installation and maintenance work has become particularly important. Based on this, thispaper first describes the main points of installation and maintenance of electromechanical equipment in large waterconservancy pumping stations, and then studies the problems that are easy to appear in the normal working process.Finally, the technical measures for installation and maintenance of mechanical and electrical equipment in largehydraulic pumping station are analyzed and summarized, which is hoped to promote the long-term and stabledevelopment of large-scale water conservancy projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3