检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁水龙 李占斌[1,2] 李鹏[1] 高海东[1] 王丹[1] 张泽宇[1] Yuan Shuilong;Li Zhanbin;Li Peng;Gao Haidong;Wang Dan;Zhang Zeyu(State Key Laboratory of Eco-hydraulic Engineering in Arid Area,Xi’an University of Technology,Xi’an 710048,China;State Key Laboratory of Soil Erosion and Dry-land Farming on the Loess Plateau,Institute of Soil and Water Conservation,Chinese Academy of Science and Ministry of Water Resources,Yangling 712100,China)
机构地区:[1]西安理工大学西北旱区生态水利工程国家重点实验室,西安710048 [2]中国科学院水利部水土保持研究所黄土高原土壤侵蚀与旱地农业国家重点实验室,杨凌712100
出 处:《农业工程学报》2018年第13期152-159,共8页Transactions of the Chinese Society of Agricultural Engineering
基 金:国家重点研发计划(2016YFC0402404);国家自然科学基金重点项目(41330858)
摘 要:为科学认识淤地坝建设对黄土高原小流域暴雨洪水过程的影响,该文通过分布式水文模型MIKE SHE和一维水动力模型MIKE 11耦合模拟了不同坝型组合和坝系级联方式下的小流域暴雨洪水过程,研究表明:1)淤地坝系建成后会使小流域洪水的洪峰和洪水总量明显减少,其中骨干坝减幅最小,中型坝次之,小型坝减幅最大;串联、并联、混联3种坝系级联方式均使洪峰流量和洪水总量明显减小,其中混联坝系减幅最大,并联坝系次之,串联坝系最小。2)淤地坝建设改变了洪水历时,其中骨干坝和中型坝增加了洪水历时,而小型坝缩短洪水历时。3)沟道连通性指数与洪峰流量、洪水总量均有很好的相关关系,淤地坝建设明显降低了沟道连通性,通过改变沟道连通性调控了小流域的暴雨洪水过程。可为黄土高原淤地坝安全运行提供科学依据。Check dam is a kind of channel management engineering measure for channel erosion control, sediment retention, reduction of flood and sediment disasters. According to the "Check Dam Planning of Soil and Water Conservation on the Loess Plateau" of the Ministry of Water Resources, 160 thousand check dams will be built on the Loess Plateau region by 2020. The construction of such a large number of check dams leads to so extremely severe a flood control situation of check dam that if there is any carelessness, the safe operation and benefit of check dam will be affected. Based on the coupling of distributed hydrological model MIKE SHE and one dimensional hydrodynamic model MIKE 11, a torrential rain flood model in Wangmaogou watershed was established in this paper and the runoff process measured at the outlet of the basin was selected as the calibration parameter. At the same time, 2 typical rainstorm and flood processes in the observed years were used to calibrate the model, and the other 2 single storms were used to verify. The results showed that the model had high precision and could be used to analyze the working conditions. By simulating the rainstorm flood process of small watershed under different combinations of dam types and different dam system cascade modes, the results were obtained as follows: 1) The torrential rain flood model of Wangmaogou watershed based on the coupling of MIKE SHE and MIKE 11 had a Nash-Sutcliffe efficiency coefficient of higher than 0.8 and a determination coefficient(R^2) of higher than 0.85 during the calibration period, while higher than 0.6 and 0.7 respectively during the verification period, which indicated that the model could be used to simulate the single rainstorm flood process in small watershed on the Loess Plateau. 2) The construction of check dam system would obviously cut the flood peak and flood volume of the watershed, among which the amplitude reduction of the key dam was the least, the medium dam was the second and the small dam was the largest. The
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30