基于IE方法的自行车车身生产线平衡优化研究  被引量:1

Research on Balance Optimization of Bicycle Body Production Line Based on IE Method

在线阅读下载全文

作  者:徐成 

机构地区:[1]安徽理工大学经济与管理学院,安徽淮南232001

出  处:《安徽职业技术学院学报》2018年第2期25-28,共4页Journal of Anhui Vocational & Technical College

摘  要:文章以昆山某公司自行车生产线为研究对象,基于IE方法的ECRS原则对该生产线的平衡问题进行改善。通过制定标准工时、对生产线物流进行路径规划和对生产现场实施6S管理这些改善措施,使平衡率由52.23%提高到89.51%,实现了"一个流"生产,并对改善方案运用Flexsim软件进行仿真,验证改善方案的合理性。The article takes the bicycle production line of a company in Kunshan as the research object and improves the balance of the production line based on the ECRS principle of the IE method. Through the development of standard man-hours, path planning for production line logistics and implementation of 6S management on the production site, the improvement measures have increased the balance from 52.23% to 89.51%, realized “one stream” production, and used Flexsim software to simulate the improvement plan and verify the rationality of the improvement program.

关 键 词:工业工程 生产线平衡 改善 Flexsim仿真 

分 类 号:U468.2[机械工程—车辆工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象