全站仪测量井下三点不通视导线点的方法及平差计算  被引量:1

Method and Adjustment of Total Station Measurement for Downhole Three Points with Wire of Invisibility

在线阅读下载全文

作  者:苏红军 SU Hong-jun(Fankou Lead-zinc Mine,Shaoguan,Guandong,512325,P.R.China)

机构地区:[1]凡口铅锌矿,广东韶关512325

出  处:《南方金属》2018年第3期60-62,共3页Southern Metals

摘  要:井下测量中经常会遇到导线点不通视,如果三个导线点互不通视,旁边又没通视的导线点时,可利用全站仪测量导线的边长和角度,经内业计算平差,得出相应的坐标值.这方法既能快速准确地指导施工,又可节省时间,不会因导线点不通视而耽误工程进度.Downhole measurements often encounter with the problem of wire point with invisibility. If the three traverse points do not pass,and there are no next to non intervisible traverse points,the total station measurement wire length and angle can be used for the inner adjustment calculation for obtaining the corresponding coordinate value. It can not only guide the construction quickly and accurately,but also can save time.

关 键 词:放样 不通视 导线点 平差 

分 类 号:TD175[矿业工程—矿山地质测量]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象