作 者:陈寒钰[1] 牛东晓[1] CHEN Han-yu;NIU Dong-xiao(North China Electric Power University,Beijing 071003,China)
机构地区:[1]华北电力大学,北京102206
出 处:《科技和产业》2018年第7期71-74,共4页Science Technology and Industry
摘 要:目前电网对建设项目的计划审核存在工作依据不明确,各专项数据规范不统一,审核资源浪费、效率低下,审核分析方式不科学、局限性大等诸多问题。为更好地适应新一轮电力体制改革,解决计划审核混乱、低效等问题,提出计划审核优化的对策建议。At present,there are many problems in the plan review of construction projects such as power grids,which are not clearly defined and perfected,the specifications of each special data are not uniform,waste of resources is reviewed,efficiency is low,and methods for audit analysis are unscientific and limited.In order to better adapt to the new round of power system reforms,solve the problems of planning review and inefficiency,and put forward plans and audits to optimize the countermeasures and suggestions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229