作 者:马国强[1] MA Guoqiang(China Railway 18th Bureau(Group)the 4th Engineering Co.,Ltd.,Tianfin 300200,China)
机构地区:[1]中铁十八局集团第四工程有限公司,天津300200
出 处:《施工技术》2018年第14期39-43,共5页Construction Technology
摘 要:基于天津地铁5号线张兴庄站盾构出洞接收工程,针对下穿既有铁路和3号线地铁的复杂工程环境以及在富水软弱地层内掘进的不利地质条件,进行轨道加强、注浆、人工地层冻结、钢护筒和惰性砂浆等多项综合施工关键技术设计,详细阐述轨道加强方式、注浆参数、惰性砂浆配合比、人工冻结管布置等设计要点,针对各项关键技术提出相应的施工要求,并最终分析各项技术的施工效果。Motivated by engineering background of shield receiving in the Zhangxingzhuang station of Tianjin subway line No. 5,the integrated key technologies of track strengthen,grouting,artificial ground freeze,steel tube and modified mortar were designed and analyzed based on the complex engineering environment,including crossing operated railway, subway line No. 3 and water-rich soft ground.Moreover,this paper deeply elaborated the key points of designing track strengthening, grouting parameters,modified mortar and arrangement of freezing pipe. Finally,the construction requests were put forward,and the construction effect was evaluated.
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249