浅谈Dimine数字矿山软件在大宝山矿采剥计划编制中的应用  被引量:4

A Brief Introduction of the Application of Dimine Digital Mine Software in Drawing Up Mining and Stripping Schedule

在线阅读下载全文

作  者:张爱术 ZHANG Ai-shu(Guangdong Dabaoshan Mining Co.,Ltd.,Shaoguan,Guangdong,512127,P.R.China)

机构地区:[1]广东省大宝山矿业有限公司,广东韶关512127

出  处:《南方金属》2018年第4期27-28,33,共3页Southern Metals

摘  要:大宝山矿公司7 000 t/d铜硫选厂于2017年4月投产,标志着大宝山矿采选流程迈入了新的阶段,也面临全新的挑战.为适应公司转型升级的发展战略,完成每年330万t入选矿的采矿任务,采用数字化矿山技术是必然之路.文章论述了Dimine数字矿山软件在大宝山矿采剥计划编制中的应用和数字化矿山技术发展趋势.The 7000t/d copper and sulphur mineral processing plant of the company was put into operation in April, 2017, and it marked that the mining and dressing process of Dabaoshan mine had gone into a new stage of whole new challenge. To adapt to transformation and upgrading of the development strategy of the company and completing the mining task of 3.3 million tons of selected ore per year, the adoption of digital mine technology is an inevitable road. The article introduces and discusses the application of Dimine digital mine software in drawing up mining and stripping schedule and the trend of development of the digital mine technology.

关 键 词:DIMINE软件 数字化矿山 采剥计划 发展趋势 

分 类 号:TD85-9[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象