检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨高阳 章少君 姚焕成 康宁 杨宏伟 YANG Gaoyang;ZHANG Shaojun;YAO Huancheng;KANG Ning;YANG Hongwei(China Construction Steel Structure Wuhan Co.,Ltd.,Wuhan 430000,Chin)
出 处:《电焊机》2018年第7期91-94,共4页Electric Welding Machine
摘 要:针对马来西亚标志塔项目厚板箱型K节点构件,从工艺上优化焊接接头形式及焊接坡口层道次序。考虑焊接接头局部缓冲效应,每层布置的第一道焊缝均从翼板侧开始。为控制焊接热输入,主体焊缝采用药芯焊丝气体保护焊打底、埋弧焊填充盖面的组合焊接方法。为控制构件的应力应变状态,合理设计主焊缝及K节点区焊缝的焊接顺序。严格控制预热、后热及层间温度,防止层状撕裂的发生,保证项目构件的交货质量。For the thick plate box K-joint component of Malaysian signature tower project,the welded joint form and welding groove sequence are optimized. Considering the local cushioning effect of welded joints,the first weld in each layer starts from the side of the flange. In order to control the welding heat input,a combined welding method of flux-cored wire gas shielded welding and submerged arc welding filling cover is adopted for the welds of main part. The welding sequences of the main weld and K joint are well-designed. Preheating, post-heat and interpass temperatures are strictly controlled to prevent lamellar tearing and guarantee the delivery quality of project components.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15