检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Mario VANHOUCKE
机构地区:[1]Ghent University,Tweekerkenstraat 2,9000 Gent,Belgium [2]Vlerick Business School,Reep 1,9000 Gent,Belgium [3]UCL School of Management,University College London,1 Canada Square,London E14 5AA,United Kingdom
出 处:《Frontiers of Engineering Management》2018年第2期133-149,共17页工程管理前沿(英文版)
基 金:funded by the Nationale Bank van Belgie(NBB)and the Bijzonder Onderzoeksfonds(BOF)for the project,under contract number BOF12GOA021
摘 要:This paper is an invited request to describe the main research challenges in the domain of resourceconstrained project scheduling. The paper is split up in three parts. In today's challenges, research endeavors that have received a significant, but still not enough, attention have been described. In tomorrow's research challenges,some promising research avenues for future research have been given. Finally, in yesterday's challenge, a research topic that started decades ago, is said to have still a huge potential in tomorrow's research agenda. This paper does not intend to give a full literature overview, nor a summary of all possible research paths. Instead, it is inspired from the author's experience in academic research and practical consultancy and it serves as a personal opinion on a nonexhaustive set of promising research avenues, rather than giving a full literature-based advice for future research directions.This paper is an invited request to describe the main research challenges in the domain of resourceconstrained project scheduling. The paper is split up in three parts. In today's challenges, research endeavors that have received a significant, but still not enough, attention have been described. In tomorrow's research challenges, some promising research avenues for future research have been given. Finally, in yesterday's challenge, a research topic that started decades ago, is said to have still a huge potential in tomorrow's research agenda. This paper does not intend to give a full literature overview, nor a summary of all possible research paths. Instead, it is inspired from the author's experience in academic research and practical consultancy and it serves as a personal opinion on a non- exhaustive set of promising research avenues, rather than giving a full literature-based advice for future research directions.
关 键 词:project management project scheduling resource constraints PERT/CPM RCPSP
分 类 号:U491[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249